NOνA (E929)
NuMI Off-Axis νe Appearance Experiment

NOvA Home       Fermilab at Work



NOVA Document 8914-v2

[NOvA DocDB Home]

Proposed Interlock Signal Interrupt Interface between Cooling System PLC and Rack Protection / Interlock Interface Chassis

Document #:
NOVA-doc-8914-v2
Document type:
other
Submitted by:
Michael Matulik
Updated by:
Michael Matulik
Document Created:
09 Apr 2013, 14:42
Contents Revised:
09 Apr 2013, 14:45
Metadata Revised:
09 Apr 2013, 14:45
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
NOVA-doc-8914-v1
09 Apr 2013, 14:42
Abstract:
A description of the required electrical connection between the NOvA Cooling system and electronics racks in the Far Detector Building
Files in Document:
Notes and Changes:
Added doc-db reference
Associated with Events:
held on 10 Apr 2013 in WH12X (Nu's Room)
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, LegalFermi National Accelerator Laboratory

DocDB Version 8.8.9, contact Document Database Administrators