This note discusses several options considered for connecting the MI8 line into the Recycler for direct injection into the Recycler from Booster. A proposed solution which uses only a vertical switch magnet and a vertical injection Lambertson to generate the required elevation change between the MI8 and Recycler. All details of the solution are presented