NOνA (E929)
NuMI Off-Axis νe Appearance Experiment

NOvA Home       Fermilab at Work



Document List by Topic

[NOvA DocDB Home]

These documents on Design and Construction Phases and sub-topics are available:
Showing documents with topic Design and Construction Phases on the most recent version. See documents with Design and Construction Phases on any version.

NOVA-doc-# Title Author(s) Topic(s) Last Updated
6699-v14 Using the "Black Box" to Measure NOvA APD Arrays
(Approved - 24 Oct 2016)
Mathew O Muether WBS 2.9 FD Procedures
WBS 2.6 Electronics Procedures
APDs
04 Jun 2015
2332-v1 NOvA DAQ Message Logging Requirements Kurt Biery et al. Online/DAQ
03 Jul 2007
2653-v17 Lattice and Survey file Repository for the Nova Project David E. Johnson et al. Main Injector Upgrades
Injection line-RR
ANU Configuration Management
Recycler Ring Upgrades
WBS 2.0 ANU Designs
Extraction line-RR
14 Jun 2010
7862-v11 Near Detector Block Assembly at CDF Donald F Friend Near Det. (WBS 2.8) Designs
Near Detector
12 Apr 2013
6995-v3 APD Drier Conceptual Design Proposal Erik A Voirin APDs
01 Feb 2012
5941-v6 ASH RIVER ASSEMBLY TABLE Ernest M Villegas Far Det. (WBS 2.9) Designs
13 Aug 2012
7542-v1 Michigan State University Fiber Loop Transmission (FLT) QA device Enrique Arrieta-Diaz et al. QA
Far Detector
WLS Fiber
WBS 2.3 WLS Fiber Designs
WBS 2.3 WLS Fiber Procedures
Module Factory Procedures
03 Jun 2012
5935-v18 FAR DETECTOR BLOCK ENVELOPE LAYOUTS Donald F Friend Far Det. (WBS 2.9) Designs
Detector Assembly
29 Feb 2012
2481-v6 IPND Support Base, Lifting Fixture, and Assembly Table
(Unapproved - No approved version)
Donald F Friend et al. Prototype Detectors
IPND Designs
12 Apr 2010
5708-v2 NOvA Far Detector Manifold Cover Design Files
(Approved - 14 Jul 2011)
Owen M. Anderson et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
14 Jul 2011
6653-v1 Ash River Detector Area Layouts Donald F Friend Far Det. (WBS 2.9) Designs
28 Oct 2011
5709-v3 NOvA Far Detector Snout Design Files
(Approved - 20 Oct 2011)
Owen M. Anderson et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
20 Oct 2011
5687-v3 Far Detector End Plate: Design for Review
(Approved - 03 Feb 2012)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
20 Sep 2011
5815-v5 FHEP BLOCK ASSEMBLY SHIPPING & HANDLING Donald F Friend FHEP Designs
19 Aug 2011
6360-v1 Ash River Pivoter Status of Assembly in Wideband Dave Pushka Detector Construction
Design and Construction Phases
19 Aug 2011
6088-v3 Far Detector Side & Center Seal Models & Drawings
(Approved - 04 Aug 2011)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
04 Aug 2011
6071-v7 Far Detector Raceway Part Design
(Approved - 01 Aug 2011)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
01 Aug 2011
6090-v2 NOvA Far Detector Optical Connector Models and Drawings
(Approved - 26 Jul 2011)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
26 Jul 2011
5973-v2 Far Detector Module Retaining Ring Design
(Approved - 14 Jul 2011)
Nathaniel M Pearson Extrusion Modules
WBS 2.5 PVC Modules Designs
14 Jul 2011
6091-v1 Fiber Tray Models & Drawings
(Approved - 14 Jul 2011)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
14 Jul 2011
6210-v1 NOvA Far Detector Optical Connector Models and Drawings (Update) Thomas Chase et al. Far Det. (WBS 2.9) Designs
Extrusion Modules
14 Jul 2011
6187-v3 Block Assembly and Block Pivoter Squareness to South Wall Layout Donald F Friend Far Det. (WBS 2.9) Designs
Detector Assembly
08 Jul 2011
5735-v1 Block Pivoter Review Documentation Patrick Lukens Far Det. (WBS 2.9) Designs
23 Mar 2011
5080-v1 Engineering Note for the IPND Water Cooling System Dave Pushka Far Det. (WBS 2.9) Designs
NDOS Water Cooling
Near Det. (WBS 2.8) Designs
IPND Designs
12 Nov 2010
4543-v3 Design of Tilting Shuttle Table Nathaniel M Pearson WBS 2.5 PVC Modules Designs
31 Aug 2010
5079-v2 August 2010 DOE Review Pivoter Breakout Talk Dave Pushka Detector Assembly
FHEP Designs
31 Aug 2010
5187-v2 Wavelength Shifting Fiber Quality Assurance for the NOvA Experiment Enrique Arrieta-Diaz et al. WLS Fiber
WBS 2.3 WLS Fiber Designs
29 Aug 2010
2848-v9 IPND Module Assembly
(Unapproved - Last approved: version 7)
Donald F Friend Prototype Detectors
IPND Designs
28 May 2010
2380-v2 NOvA Optical Connector Models and Drawings
(Approved - 03 Feb 2010)
Thomas Chase Extrusion Modules
WBS 2.5 PVC Modules Designs
03 Feb 2010
4123-v1 NOvA IPND Fiber Cover Models and Drawings
(Approved - 02 Feb 2010)
Thomas Chase Extrusion Modules
IPND Designs
01 Feb 2010
3991-v1 NOvA IPND Fiber Tray Models and Drawings
(Approved - 02 Feb 2010)
Thomas Chase Extrusion Modules
IPND Designs
01 Feb 2010
3924-v2 NOvA Side Seal Models and Drawings
(Approved - 29 Sep 2009)
Thomas Chase Far Det. (WBS 2.9) Designs
Extrusion Modules
WBS 2.5 PVC Modules Designs
IPND Designs
29 Sep 2009
3869-v5 NOvA IPND Snout Models and Drawings
(Approved - 25 Sep 2009)
Thomas Chase Extrusion Modules
WBS 2.5 PVC Modules Designs
IPND Designs
25 Sep 2009
3192-v2 NOvA IPND Top Raceway Models and Drawings
(Approved - 18 Sep 2009)
Thomas Chase Extrusion Modules
WBS 2.5 PVC Modules Designs
18 Sep 2009
2874-v5 NOvA IPND Bottom Raceway Models and Drawings
(Approved - 18 Sep 2009)
Thomas Chase Extrusion Modules
WBS 2.5 PVC Modules Designs
18 Sep 2009
2517-v6 NOvA Manifold Cover Models and Drawings
(Approved - 20 Sep 2009)
Thomas Chase Extrusion Modules
WBS 2.5 PVC Modules Designs
16 Sep 2009
1843-v1 Main Injector and Recycler Kicker Apertures for the Nova Project
(Unapproved - Last approved: version 2)
David E. Johnson Kickers-RR
ANU Configuration Management
Requirements
ANU Reviews
01 Oct 2007
3700-v1 NOvA Center Seal Models and Drawings
(Approved - 07 Jul 2009)
Thomas Chase Far Det. (WBS 2.9) Designs
Extrusion Modules
WBS 2.5 PVC Modules Designs
06 Jul 2009
2699-v7 Fiber Retaining Ring Model and Drawings
(Approved - 07 Jul 2009)
Thomas Chase et al. Extrusion Modules
WBS 2.5 PVC Modules Designs
IPND Designs
06 Jul 2009
3962-v1 The NOvA Experiment Gary Feldman Conference Writeups
Detector Construction
NuMI Upgrades
Physics
Design and Construction Phases
06 Jul 2009
1877-v2 NOvA Run Control Requirements Kurt Biery et al. WBS_X.7 DAQ Requirements
DAQ Software Requirements
30 Jun 2009

Number of documents found: 41

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, LegalFermi National Accelerator Laboratory

DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 7 wallclock secs ( 0.79 usr + 0.23 sys = 1.02 CPU)