NOνA (E929)
NuMI Off-Axis νe Appearance Experiment

NOvA Home       Fermilab at Work



Document List by Topic

[NOvA DocDB Home]

These documents on ANU Configuration Management (subtopic of Project Management) are available:
Showing documents with topic ANU Configuration Management on the most recent version. See documents with ANU Configuration Management on any version.

NOVA-doc-# Title Author(s) Topic(s) Last Updated
2653-v17 Lattice and Survey file Repository for the Nova Project David E. Johnson et al. Injection line-RR
ANU Configuration Management
Recycler Ring Upgrades
WBS 2.0 ANU Designs
Main Injector Upgrades
Extraction line-RR
14 Jun 2010
1556-v7 NOvA ANU Parameter List Robert Zwaska ANU Configuration Management
NOvA Parameters
Operational parameters
ANU Reviews
ANU watch list
05 Nov 2011
1531-v1 Magnet and Instrumentation Counts for Nova Recycler Upgrade David E. Johnson Recycler Ring Upgrades
15 Mar 2007
1529-v3 Recycler Abort Line with Gap Clearing Kickers for the Nova Project David E. Johnson ANU Configuration Management
Other-Recycler Ring
Kickers-RR
12 Jul 2010
1843-v1 Main Injector and Recycler Kicker Apertures for the Nova Project
(Unapproved - Last approved: version 2)
David E. Johnson ANU Configuration Management
Requirements
Kickers-RR
ANU Reviews
01 Oct 2007
1533-v0 MI30 Lambertson and Kicker Configuration for Injection from the Recycler David E. Johnson Other-Main Injector
Extraction line-RR
15 Mar 2007
1495-v0 Recycler Injection Kicker Configuration in the Nova Era David E. Johnson Injection line-RR
Kickers-RR
09 Mar 2007

Number of documents found: 7

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, LegalFermi National Accelerator Laboratory

DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 7 wallclock secs ( 1.07 usr + 0.44 sys = 1.51 CPU)